bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Removing And Installing Transmission (GS5-39DZ, M47TU _ M57)|Page 1128 > < 9 RA Removing And Installing Transmission (GS5-39DZ, M47TU _ M57)|Page 1126
Page 6
background image

M47TU:

Suspend special tool 11 8 022 from left and right control arms.

Lower transmission until cylinder head touches bulkhead.

Important!

Position special tool so that engine oil sump is securely
resting on special tool.

Tighten down knurled screws until special tool rests against
engine oil sump.

M57:

Lower transmission until cylinder head touches bulkhead.

Secure engine at front in removal position with hydraulic lifter 
00 2 030 .

Note:

Pressure line of clutch slave cylinder remains connected.

Important!

Slowly relieve tension on clutch slave cylinder as otherwise air
will be taken in through sealing sleeve.

Release nuts and remove clutch slave cylinder.

Tightening torque 21 52 5AZ .

Release and lever out bearing pin (1) with a screwdriver.

RA  Removing and installing transmission (GS5-39DZ, M47TU / M57)

BMW AG - TIS

15.02.2013  12:52

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 6 -

9 RA Removing And Installing Transmission (GS5-39DZ, M47TU _ M57)|Page 1128 > < 9 RA Removing And Installing Transmission (GS5-39DZ, M47TU _ M57)|Page 1126