bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Both Timing Chains (M57TU)|Page 615 > < 3 RA Checking Camshaft Timing (M57TU)|Page 613
Page 1
background image

11 31 052

Replacing both timing chains (M57TU)

Special tools required:

11 3 340

Necessary preliminary tasks:

Remove engine. 

Remove cylinder head.

Removing oil pan. 

Replace crankshaft radial seal.

Remove timing case. 

Caution!

Protect alternator against engine oil.

Cover alternator with suitable apparatus. 

(Risk of damage).

Assemble charge air hoses without grease and dry.

Lock chain tensioner (1) at bottom with special tool  11 3 340 .

Detach clamping rail (3).

Detach guide rail (4). 

Installation:

Tightening torque: 13 52 2AZ

.

RA  Replacing both timing chains (M57TU)

BMW AG - TIS

15.02.2013  14:01

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

4 RA Replacing Both Timing Chains (M57TU)|Page 615 > < 3 RA Checking Camshaft Timing (M57TU)|Page 613