3 Series E46 330i (M54) TOUR
Remove heat shield (1).
Release screws.
Tightening torque, 26 11 1AZ.
Installation:
Replace self-locking nuts.
Grip propeller shaft.
Release nuts.
Tightening torque, 26 11 6AZ.
Bend propeller shaft downwards at center bearing (1). Detach
propeller shaft from transmission output flange and tie back to
side on vehicle underbody.
Grip output flange (1) with special tool 23 0 020 .
Release hexagon nut.
Tightening torque, 24 21 1AZ.
Detach output flange (1).
Installation:
Install hexagon nut with screw retaining compound.
RA Replacing output flange (A5S 360R / 390R)
BMW AG - TIS
15.02.2013 20:40
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -