bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Removing And Installing_replacing Alternator (S54)|Page 733 > < 3 RA Removing And Installing_replacing Alternator (S54)
Page 2
background image

Release screw on holder for oil cooler lines (1).

Caution!

Have a cleaning cloth ready. A small quantity of oil will
emerge after the oil lines have been disconnected.

Make sure no oil runs onto the alternator. Remove any
remnants of oil immediately with cleaning cloth.

Release screw.

Detach oil lines from main flow oil filter housing.

Lay oil lines to one side to open up access to screw connection of
battery positive lead on alternator.

Installation:

Replace O-rings.

Release nut (1).

Installation:

Tightening torque, 12 31 1AZ.

Remove battery positive lead from alternator.

Unlock plug (2) and detach from alternator.

Release screw (1).

Lift off protective cap of screw (2) of tensioning roller. 

Release screw (2) and pull out together with tensioning roller.

Remove alternator.

RA  Removing and installing/replacing alternator (S54)

BMW AG - TIS

16.02.2013  09:38

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

3 RA Removing And Installing_replacing Alternator (S54)|Page 733 > < 3 RA Removing And Installing_replacing Alternator (S54)