3 Series E90 320d (M47T2) SAL
Release union nut (1) (high-pressure line).
Installation:
Replace high-pressure line (2).
Tightening torque 13 53 8AZ
.
Connect special tool 13 5 450 to high-pressure pump.
Important!
Special tool 13 5 455 may be used a maximum of 3 times.
Disconnect plug connection for pressure control valve (3) and rail
pressure sensor (5). Connect special tools 13 5 456 and
13 5 457 between special tool 13 5 450 and engine wiring
harness.
Connect return line (4).
Note:
M47TU only.
Connect special tools 12 7 420 and 61 4 390 to control unit
plug (X2412).
Jumper pin 32 (ground) to pin 2.
Note:
M47TU only.
Disconnect plug connection (1) at H.P. pump (2).
Note:
DDE software
≤
V42 Diagnosis not possible.
DDE software V42 or
≥
V42 (reprogram if necessary).
DIS Tester procedure.
-
<DDE 5.0.
-
<Control unit function.
-
<Identification (function software) V42 or
≥
V42.
-
<Diagnostic request.
-
<Rail pressure.
RA Checking high-pressure pump (M47TU / M57TU / M57T2)
BMW AG - TIS
23.01.2013 07:23
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -