bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

25 Piston With Rings And Pin > < 1 RA Replace All Big-end Bearings (N53)|Page 315
Page 3
background image

Important!

Do not distort connecting rods or crankshaft.

Use the old connecting rod bolts to check connecting rod
clearance.

Tighten down connecting rod bolts with special tool  00 9 120 .

Tightening torque  11 24 1AZ

.

Remove bearing cap. Read off bearing clearance at width of
crushed plastic thread with aid of measuring scale.

connecting rod bearing clearance.

Remove plastic thread.

Coat crankshaft and bearing shells with oil.

Install new connecting rod bolts and tighten down with special

tool  00 9 120 .

Tightening torque  11 24 1AZ

.

Assemble engine.

RA  Replace all big-end bearings (N53)

BMW AG - TIS

20.02.2013  20:35

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

25 Piston With Rings And Pin > < 1 RA Replace All Big-end Bearings (N53)|Page 315