3 Series E90 335d (M57T2) SAL
Release banjo bolt (1) and disconnect pressure line (2).
Installation:
Replace all sealing rings.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 8AZ
.
Release hose clamp (3) and detach suction line (4) from vane
pump.
Installation:
Markings (5) on suction line and vane pump connection must
match up.
Release screws (1-3) and remove vane pump (4) towards top.
Installation:
Make sure screws are installed in correct positions.
•
Screw (1) M8x80
•
Screw (2) M8x40
•
Screw (3) M6x85
Insert screws (1-3) (do not tighten down)
Tighten down screws (1, 2).
Tightening torque, 32 41 6AZ
.
Tighten screw (3).
Tightening torque, 32 41 6AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Removing and installing/replacing vane pump for power steering (M57T2 335d)
BMW AG - TIS
21.02.2013 11:12
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -