bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Adjusting Camshaft Timing (S65)|Page 362 > < 9 RA Adjusting Camshaft Timing (S65)|Page 360
Page 5
background image

Cylinders 1 to 4:

Always start screwing on the inlet side.

Secure central bolt (1) with special tool  00 9 120 .

Important!

Central bolt final tightening.

1. 

Joining 20 Nm

2. 

Settling torque 80 Nm

3. 

Torsion angle 200

°

Secure central bolt (1) with special tool  00 9 120 .

Important!

Central bolt final tightening.

1. 

Joining 20 Nm

2. 

Settling torque 80 Nm

3. 

Torsion angle 200

°

Important!

Remove all special tools.

Position of inlet camshaft, cylinders 5-8.

Designation (E2) on dihedron points upwards.

Installation:

If necessary, crank at crankshaft central bolt.

Position of exhaust camshaft, cylinders 5-8.

Designation (A2) on dihedron points upwards.

RA  Adjusting camshaft timing (S65)

BMW AG - TIS

22.02.2013  10:29

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

9 RA Adjusting Camshaft Timing (S65)|Page 362 > < 9 RA Adjusting Camshaft Timing (S65)|Page 360