bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Removing And Installing_replacing Clutch (GS6-53BZ) S65|Page 628 > < 2 RA Replacing Roller Bearing For Dual-mass Flywheel|Page 626
Page 1
background image

21 21 500

Removing and installing/replacing clutch
(GS6-53BZ) S65

Special tools required:

11 9 260

11 9 265

21 2 170

21 2 180

21 2 280

Necessary preliminary tasks:

Remove transmission.

Important!

Pressure plate and dual-mass flywheel are balanced together.

The clutch must be replaced if a new clutch is fitted.

Both the pressure plate and the dual-mass flywheel have a
line marking.

These line markings must line up during assembly.

Block flywheel with special tools 11 9 260  and 11 9 265 .

RA  Removing and installing/replacing clutch (GS6-53BZ) S65

BMW AG - TIS

22.02.2013  11:57

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

3 RA Removing And Installing_replacing Clutch (GS6-53BZ) S65|Page 628 > < 2 RA Replacing Roller Bearing For Dual-mass Flywheel|Page 626