3 Series E91 320i (N43) TOUR
Open plug (1).
Installation:
Replace sealing ring.
Tightening torque: 11 31 8AZ
.
Important!
Take care - screw can fall down very easily.
Remove lower screw of chain guide.
Tightening torque: 11 31 6AZ
.
Release screw (1).
Unlock retainer (2).
Detach coolant hose (3) from cylinder head and thermostat.
Installation:
Replace O-rings.
Release screws (1).
Remove coolant pipe (2).
Installation:
Replace O-rings.
RA Removing and installing/sealing cylinder head (N43)
BMW AG - TIS
24.01.2013 07:34
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -