3 Series E91 320i (N43) TOUR
Tighten down nut with special tool 37 1 151 .
Hold fuel injector with spanner (1) while tightening.
Tightening torque 13 53 2AZ
.
Tighten nuts of delivery lines (1) in illustrated sequence.
Tightening torque 13 53 3AZ
.
Install feed line (1).
In so doing, tighten nut (2) and screw (3) hand-tight only.
Tighten nut (1).
Tightening torque 13 53 4AZ
.
RA Removing and installing or replacing high-pressure rail (N43)
BMW AG - TIS
24.01.2013 08:23
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 6 -