3 Series E91 320i (N46T) TOUR
Important!
Cut outer plate only for following severance cuts.
Measurement a = approx. 128 mm behind hole dia. 25 mm.
Measurement b = approx. 100 mm from roof edge.
Measurement c = approx. 80 mm below cut b.
Measurement d = approx. 190 mm from centre point of hole dia. 20 mm.
Open weld joints in areas (1).
Installation:
Cut out metal section (2) is needed again for sealing.
Weld in reinforcing panels at all severance cuts.
Mark severance cut in accordance with specified measurement
and cut.
Important!
Cut outer metal plate only for following severance cut.
Measurement a = 140 mm from roof edge.
Installation:
Weld in reinforcement plate at severance cut.
Note:
View from inside
Open weld joints in areas (1).
Note:
View from inside
Open adhesive bonds in areas (1).
RA Replacing cover for longitudinal member with left door pillar (partial replaceme
BMW AG - TIS
26.01.2013 11:02
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -