3 Series E91 323i (N52) TOUR
11 41 000
Removing and installing oil pump (N52)
Necessary preliminary tasks:
•
Removing oil pan.
Release screws (1).
Tightening torque: 11 41 1AZ
.
Installation:
Replace aluminium screws.
Remove intake pipe (2) in direction of arrow.
Release screw (1).
Tightening torque: 11 41 4AZ
.
Release screws (2).
Tightening torque: 11 41 3AZ
.
Release screws (1).
Tightening torque: 11 41 2AZ
.
Installation:
Replace aluminium screws.
RA Removing and installing oil pump (N52)
BMW AG - TIS
27.01.2013 20:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -