bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

14 RA Installing Replacement Transmission (GA6HP19Z) AWD|Page 799 > < 13 RA Removing And Installing Automatic Transmission (GA6L45R) AWD|Page 797
Page 1
background image

24 00 050

Installing replacement transmission
(GA6HP19Z) AWD

Drain automatic transmission fluid at oil drain plug.

Tightening torque: 24 11 6AZ

.

Important!

After completion of work, program transmission control unit.

Recycling:

Catch and dispose of escaping transmission fluid.

Observe country-specific waste-disposal regulations

Important!

Before installing replacement transmission, always flush 
transmission fluid cooler together with lines.

After completion of work, check transmission fluid level.

Replacement transmission is supplied filled with
transmission fluid.

Use only the approved transmission fluid.

Failure to comply with this instruction will result in serious
damage to the transmission.

Necessary preliminary tasks:

Remove automatic transmission.

Remove transfer box

Modify bracket

RA  Installing replacement transmission (GA6HP19Z) AWD

BMW AG - TIS

11.02.2013  11:49

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

14 RA Installing Replacement Transmission (GA6HP19Z) AWD|Page 799 > < 13 RA Removing And Installing Automatic Transmission (GA6L45R) AWD|Page 797