bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Reversing Light Switch > < 11 RA Installing Replacement Transmission (GS6-53BZ_DZ)|Page 740
Page 1
background image

23 11 615

Replacing guide tube for clutch release unit
(GS6-53BZ/DZ)

Note:

(transmission removed)

Necessary preliminary tasks:

Remove clutch release bearing and release lever from guide

tube

Release screws.

Remove guide tube (1).

Installation:

Clean thread.

Install screws with Loctite 243.

Tightening torque  23 11 2AZ

.

Note:

Remove sticker (1) and adhesive with a suitable solvent.

RA  Replacing guide tube for clutch release unit (GS6-53BZ/DZ)

BMW AG - TIS

17.02.2013  19:59

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 RA Replacing Reversing Light Switch > < 11 RA Installing Replacement Transmission (GS6-53BZ_DZ)|Page 740