3 Series E91 335xi (N54) TOUR
Unscrew nuts (1).
Remove turbocharger towards top.
Tightening torque: 11 65 1AZ
.
Important!
Risk of damage! To wastegate linkage.
Do not misuse wastegate linkage for carrying.
Replace graphite rings (1).
Note:
Illustration shows turbocharger (cyl. 4 to 6).
Assemble engine.
Clear DME fault memory.
RA Removing and installing/replacing exhaust-gas turbocharger for cylinders 1-3 (N5
BMW AG - TIS
23.02.2013 14:18
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -