3 Series E91 335xi (N54) TOUR
23 00 018
Removing and installing transmission (GS6-
53BZ) N54 AWD
Special tools required:
•
00 2 030
•
00 9 010
•
00 9 120
•
00 9 130
•
21 2 240
•
23 0 132
•
23 4 050
Important!
After completion of work, check gear oil level.
Use only the approved gear oil.
Failure to comply with this requirement will result in serious
damage to the manual transmission.
Important!
Aluminium screws/bolts must be replaced each time they are
released.
The end faces of aluminium screws/bolts are painted blue for
the purposes of reliable identification.
Jointing torque and angle of rotation must be observed
without fail (risk of damage).
Necessary preliminary tasks:
•
Disconnect battery
•
Remove front underbody protection.
•
Remove rear underbody protection.
•
Remove reinforcement plate.
•
Remove complete exhaust system
•
Remove heat shields
•
Remove front propeller shaft.
•
Remove rear propeller shaft.
RA Removing and installing transmission (GS6-53BZ) N54 AWD
BMW AG - TIS
23.02.2013 16:15
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -