bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 696 > < 1 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 694
Page 5
background image

Tighten down bolts of high-pressure pump (1).

Note:

Evenly tighten bolts alternately to avoid the high-pressure

pump twisting!

Tightening torque 13 51 1AZ

.

Tighten bolts of high-pressure rail (1) in illustrated sequence.

Tightening torque 13 53 6AZ

.

Tighten nuts of delivery line (1) in illustrated sequence.

Tightening torque 13 53 4AZ

.

Tighten nuts of delivery lines (1) with special tool  37 1 151  in
illustrated sequence.

Note:

Hold hexagon of fuel injector while tightening (see following

illustration R13 14 - 93)

RA  Removing and installing or replacing high-pressure rail (N43)

BMW AG - TIS

20.01.2013  10:37

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

1 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 696 > < 1 RA Removing And Installing Or Replacing High-pressure Rail (N43)|Page 694