3 Series E92 325xi (N53) COUPE
Press locking tab (1) in direction of arrow and pull contact
carrier (2) out of housing.
Release screws and remove cable duct (1).
Installation:
Replace aluminium screws.
Tightening torque 12 52 2AZ
.
Work step
Note:
Unlock plug connections on ignition coils and disconnect
Unlock plug on injectors and disconnect
Release ground connections
Unlock plug on both solenoid valves and disconnect
Unlock plug on inlet and exhaust camshaft sensors and disconnect
Unlock plug for high-pressure sensor and disconnect
Unlock plug on oil pressure switch and disconnect
Unlock plug on coolant temperature sensor and disconnect
Remove front underbody protection
Unlock plug on oil pressure hydraulic valve and disconnect.
Unlock plug on electric coolant pump and disconnect
Unlock plug on coolant thermostat and disconnect
Release ground connection on engine next to coolant pump
Tightening torque 12 52 3AZ
.
Replace screw.
RA Replacing wiring harness section for ignition coil (N53)
BMW AG - TIS
28.01.2013 00:27
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -