bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Removing And Installing Transmission (GS6-17BZ) N51_N52_N52K_N53|Page 732 > < 10 RA Removing And Installing Transmission (GS6-17BZ) N51_N52_N52K_N53|Page 730
Page 5
background image

Unlock bearing pin (1) in direction of arrow and remove.

Lift out shift arm (1).

Installation:

Grease bearing pin.

Grease,

 refer to BMW Service Operating Fluids.

Release screws.

Installation:

Tightening torque, steel screws 23 00 1AZ

.

Aluminium screws/bolts must be replaced.

Tightening torque and angle of rotation

Aluminium screws/bolts 23 00 2AZ

.

Important!

Do not suspend the transmission from the transmission input
shaft during removal and installation as this will deform the
clutch plate. Pull out transmission towards rear and remove.

Installation:

Tighten down screws/bolts to specified torque.

Secure special tool and angle of rotation 00 9 120  with magnet 
00 9 130  to floor plate.

Continue to screw down blue aluminium screws/bolts in
accordance with angle of rotation.

Angle of rotation 23 00 2AZ

.

RA  Removing and installing transmission (GS6-17BZ) N51/N52/N52K/N53

BMW AG - TIS

23.02.2013  13:02

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

10 RA Removing And Installing Transmission (GS6-17BZ) N51_N52_N52K_N53|Page 732 > < 10 RA Removing And Installing Transmission (GS6-17BZ) N51_N52_N52K_N53|Page 730