bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Centre Muffler (N53)|Page 708 > < 2 RA Replacing Centre Muffler (N53)
Page 2
background image

Unscrew nuts.

Installation:

Tightening torque,  18 20 3AZ

Release screw.

Installation:

Tightening torque,  18 20 1AZ

Release nitrogen oxide sensor.

Installation:

Tightening torque,  11 78 6AZ

Important: Distinguish between new part and reused part

Release exhaust-gas temperature sensor

Installation:

Tightening torque,  11 78 4AZ

RA  Replacing centre muffler (N53)

BMW AG - TIS

09.02.2013  22:22

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

2 RA Replacing Centre Muffler (N53)|Page 708 > < 2 RA Replacing Centre Muffler (N53)