bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

65 Supercharger With Control > < 3 RA Checking Diagnosis Unit For Overpressure And Vacuum Pressure|Page 406
Page 4
background image

Initial position (1) of wastegate linkage with vacuum pressure.

Wastegate valve closed.

Checking wastegate valve (1) with vacuum pressure:

Wastegate valve must be opened without vacuum pressure.

The wastegate valves must close if a vacuum pressure is applied
at the wastegate sockets (see BMW diagnosis system).

Check shaft on turbine wheel for rotatability.

Follow diagnosis instructions.

RA  Checking diagnosis unit for overpressure and vacuum pressure

BMW AG - TIS

18.02.2013  17:45

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

65 Supercharger With Control > < 3 RA Checking Diagnosis Unit For Overpressure And Vacuum Pressure|Page 406