3 Series E92 335xi (N54) COUPE
Adhere to tightening sequence:
•
First tighten down nut (1) on injector.
•
Then tighten down nut (2) on high-pressure rail.
When tightening nut (1) on injector, grip hexagon head of injector
with wrench (3).
Tighten down nuts with special tool 37 1 151 .
Tightening torque 13 53 8AZ
.
Assemble engine.
Check fuel system for leaks.
Check function of DME.
RA Removing and installing or replacing a high-pressure line (N54, N53)
BMW AG - TIS
20.02.2013 06:13
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -