bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Removing And Installing_sealing A Throttle Valve Assembly (S65)|Page 565 > < 2 RA Performing Throttle Valve Basic Setting (S65)|Page 563
Page 1
background image

13 54 045

Removing and installing/sealing a throttle
valve assembly (S65)

Necessary preliminary tasks:

Read out fault memory of DME control unit

Switch off ignition

Follow instructions on connecting and disconnecting battery

Disconnect battery negative lead and cover

Remove intake air manifold

Remove all injectors

Release and raise cable duct for engine wiring harness; to do

so, partially remove engine wiring harness.

Disengage pull rods of throttle valve actuating motor.

Release all nuts of throttle valve flanges.

Release idle air hose connection.

Lift out throttle valve bank.

Release idle air duct on throttle valve bank.

RA  Removing and installing/sealing a throttle valve assembly (S65)

BMW AG - TIS

21.02.2013  19:39

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

3 RA Removing And Installing_sealing A Throttle Valve Assembly (S65)|Page 565 > < 2 RA Performing Throttle Valve Basic Setting (S65)|Page 563