bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Installing Replacement Transmission (GS6-53BZ) S65|Page 775 > < 9 RA Removing And Installing Transmission (GS6-53BZ)|Page 773
Page 1
background image

23 00 037

Installing replacement transmission (GS6-
53BZ) S65

Important!

After completion of work, check transmission fluid level.

Use only the approved transmission fluid.

Failure to comply with this instruction will result in serious damage
to the transmission.

Recycling:

Catch and dispose of escaping transmission fluid.

Observe country-specific waste-disposal regulations

Necessary preliminary tasks:

Drain gear oil at oil drain plug. Tightening torque:23 00 4AZ

.

Remove transmission.

Convert shift rod joint.

Push back retaining ring (1) and drive out dowel pin (2).

RA  Installing replacement transmission (GS6-53BZ) S65

BMW AG - TIS

21.02.2013  20:57

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

10 RA Installing Replacement Transmission (GS6-53BZ) S65|Page 775 > < 9 RA Removing And Installing Transmission (GS6-53BZ)|Page 773