bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

6 RA Adjusting Camshaft Timing (N51)|Page 350 > < 6 RA Adjusting Camshaft Timing (N51)|Page 348
Page 3
background image

Important!

Risk of damage!

To open central bolt, mount special tools 11 4 283  
11 4 281  and  11 4 282  on camshaft.

Release central bolts (1).

Release central bolts (1) with special tool  11 4 280  only.

Release chain tensioner (2) (have a cleaning cloth ready).

Note:

Illustrations in CAD do not show special tools.

Turn sensor gears (2) in direction of arrow until locating pins (1)
on special tool 11 4 290  match up.

Slide on special tool 11 4 290  in direction of arrow.

Secure special tool 11 4 290  with bolts (1).

Screw special tool 11 9 340  into cylinder head.

Pretension timing chain with special tool 00 9 250  to 0.6 Nm .

Secure both central bolts of adjustment units to camshafts with
special tool 00 9 120 .

Tightening torque: 11 36 1AZ.

RA  Adjusting camshaft timing (N51)

BMW AG - TIS

04.02.2013  20:03

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

6 RA Adjusting Camshaft Timing (N51)|Page 350 > < 6 RA Adjusting Camshaft Timing (N51)|Page 348