bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Complete Injection Pipe (N52_ N52K) > < 1 RA Replacing Complete Injection Pipe (N51)|Page 494
Page 3
background image

Release screws.

Tightening torque 13 53 2AZ

.

Remove injection pipe (1).

Lever out retainers (1).

Pull fuel injectors out of injection pipe.

Installation:

Replace sealing rings on fuel injectors and coat with anti-
friction rubber coating.

Note:

Check stored fault messages.

Now clear the fault memory.

RA  Replacing complete injection pipe (N51)

BMW AG - TIS

04.02.2013  20:42

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

2 RA Replacing Complete Injection Pipe (N52_ N52K) > < 1 RA Replacing Complete Injection Pipe (N51)|Page 494