bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Vacuum Unit (wastegate) (N54) > < 2 RA Removing And Installing_replacing Exhaust-gas Turbocharger For Cylinders 4-6 (N5|Page 400
Page 4
background image

Unscrew nuts (1).

Remove turbocharger towards bottom.

Tightening torque:11 65 1AZ

.

Important!

Risk of damage! To wastegate linkage.

Do not misuse wastegate linkage for carrying.

Replace graphite rings (1).

Assemble engine.

Clear DME fault memory.

RA  Removing and installing/replacing exhaust-gas turbocharger for cylinders 4-6 (N5

BMW AG - TIS

12.02.2013  01:38

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

3 RA Replacing Vacuum Unit (wastegate) (N54) > < 2 RA Removing And Installing_replacing Exhaust-gas Turbocharger For Cylinders 4-6 (N5|Page 400