bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Electromagnetic CNG High-pressure Non-return Valve > < 3 RA Removing And Installing_replacing CNG Filler Connection (E34)|Page 604
Page 3
background image

Installation:

Secure inner race (1) with screw (2), then work bracket (3)
carefully over line.

Installation:

Lug (1) on filler connection must engage in aperture in body.
Counter-support (2) must be fitted from interior of vehicle.

Installation:

Perform leak and pressure test

refer to 13 80 600

RA  Removing and installing/replacing CNG filler connection (E34)

BMW AG - TIS

15.01.2013  13:29

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

4 RA Replacing Electromagnetic CNG High-pressure Non-return Valve > < 3 RA Removing And Installing_replacing CNG Filler Connection (E34)|Page 604