5 Series E34 525i (M50) SAL
Unclip fuel lines (2) and line for reversing light (3) from bracket.
Unfasten nuts and remove cable.
Installation:
Note line routing.
Tightening torque, refer to
Technical Data 12 41 4AZ
Unfasten top and bottom nuts on starter screw connection.
Installation:
Tightening torque, refer to
Technical Data 12 41 1AZ
Unfasten nut (1) on support and remove starter.
RA Removing and installing/replacing starter motor (M50, M52, manual transmissions
BMW AG - TIS
20.01.2013 19:29
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -