5 Series E34 525tds (M51) SAL
Installation:
Screw (1) (M7 thread) is fitted with a spigot and also serves to
locate the timing-chain guide.
Check housing and cover for signs of wear and fretting corrosion.
Installation:
Bevel on outer rotor points towards housing.
Caution!
The sleeve for the control plunger is under spring pressure.
Press sleeve downwards gently using suitable mandrel.
Remove circlip.
Installation:
1.
Control plunger
2.
Spring
3.
Sleeve
Note:
Replace O-ring.
RA Installing and removing or replacing oil sump (M51)
BMW AG - TIS
23.01.2013 20:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -