5 Series E34 525tds (M51) SAL
Installation:
1.
Circlip
2.
Spring disc
3.
Outer discs
4.
Lined discs
5.
Top outer disc (thicker)
Press input shaft (1) out of cylinder A + C.
Installation:
Replace O-ring (2).
Replace damaged rectangular rings (3).
For ease of assembly, coat O-ring (2) and rectangular
rings (3) with Vaseline.
D brake/E1/E2 and planetary gear set:
Arrange transmission horizontally.
Unscrew bolts.
Installation:
Tightening torque,
refer to Technical Data 24 11 1AZ.
Pull off transmission extension (1).
Installation:
Replace O-ring
For ease of assembly, coat O-ring with Vaseline.
RA Dismantling and assembling automatic transmission (A5S560Z)
BMW AG - TIS
23.01.2013 20:46
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 14 -