5 Series E39 520d (M47) TOUR
Release nut (2).
Installation:
Tightening torque, 12 42 1AZ.
Secure battery positive lead (3) to engine.
Release nut (1).
Remove grounding cable (2) from right engine support arm and
lay to one side.
Detach vacuum hose from left engine mount.
Remove acoustic insulation (1) from left engine support arm.
Release engine mounts on right and left at top and loosen at
bottom.
RA Removing and installing engine (M47)
BMW AG - TIS
23.01.2013 22:27
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 8 -