5 Series E39 520d (M47) TOUR
Remove special tool 11 2 300.
Position special tool 11 6 310 on vibration damper (1). Protect
engine bracket from damage. Insert wood between engine support
and special tool 11 6 310. Tighten central bolt (2) to approx.
150 Nm.
Tighten down chain wheel nut (3).
Tightening Torque of chain wheel nut (3),
refer to Technical Data 13 52 2AZ.
Release central bolt (2) and remove vibration damper (1) again.
Remove timing case cover at bottom,
refer to 11 14 110.
Crank engine again to 45
°
before firing TDC position for first
cylinder.
Note:
If the engine has been cranked and the firing TDC position of
the injection pump for the first cylinder is no longer known, it
can be sought for via the setting value of the injection pump.
The procedure is described in the work step Removing and
installing cylinder head,
refer to 11 12 100.
RA Replacing both timing chains (M47)
BMW AG - TIS
23.01.2013 22:53
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 7 -