5 Series E39 520i (M52) SAL
Bend propeller shaft downwards on center bearing.
Remove propeller shaft from transmission output flange and
remove constant-velocity joint from final drive.
Note:
Protect constant-velocity joint from dirt with transport cap.
Installation:
Top up grease fill.
Grease,
refer to BMW Parts Service.
Pull out constant-velocity joint (1) up to stop.
Coat sealing faces of constant-velocity joint and input flange
with grease.
Replace seal (2).
Use new nuts.
Attach propeller shaft with constant-velocity joint pulled apart
to drive flange of final drive.
Important!
The constant-velocity joint must not be compressed during
assembly because the grease fill can force away the sealing
ring, leading to leakage from the constant-velocity joint.
Alternately tighten 2 opposing nuts to draw constant-velocity joint
evenly into the input flange.
Then tighten down the remaining nuts.
Tightening torque 26 11 4AZ .
Installation:
Check centering mount (4).
Replace damaged centering mount.
Grease centering mount.
Grease,
Refer to BMW Service Operating Fluids.
RA Removing and installing complete propeller shaft
BMW AG - TIS
30.01.2013 09:11
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -