bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

21 RA Removing And Installing Transmission (S5D 200G _ S5D 250G)|Page 1018 > < 21 RA Removing And Installing Transmission (S5D 200G _ S5D 250G)|Page 1016
Page 3
background image

Caution!

Pressure line remains connected.

Slowly relieve tension on clutch slave cylinder during removal as
otherwise air will be drawn in through sealing sleeve.

Release nuts and remove clutch slave.

Tightening torque, 21 52 5AZ.

Remove stabilizer links from stabilizer bar 31 35 005.

Swivel stabilizer bar upwards.

Support transmission with a workshop hoist.

Release screws and remove cross-member.

Tightening torque, 23 71 2AZ.

Secure engine with a spacer.

Lower transmission.

RA  Removing and installing transmission (S5D 200G / S5D 250G)

BMW AG - TIS

03.02.2013  17:18

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

21 RA Removing And Installing Transmission (S5D 200G _ S5D 250G)|Page 1018 > < 21 RA Removing And Installing Transmission (S5D 200G _ S5D 250G)|Page 1016