bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Routing Of Pipes (air Lines) (touring) > < 3 RA Removing And Installing_replacing Pipe (air Line) For Air Spring To Air Reservoi|Page 1887
Page 1
background image

37 13 ...

Assembly instructions for a new tube (air line)
and new screw connection

Caution!

The tubes must not be cut!

Do not dismantle the screw connection!

Tighten complete new screw connection (comprising toothed ring
(1), cap screw (2) and assembly plug (3), in air spring strut and/or
distributor block and/or tube (of spring to air tank).

Tightening Torque,

refer to Technical Data 37 12 3AZ.

Remove assembly plug (3).

Slide new tube (4) in as far as bulge (4.1).

 (2) Cap screw

 (5) Air spring strut and/or distributor block and/or tube (from

spring to air tank)

RA  Assembly instructions for a new tube (air line) and new screw connection

BMW AG - TIS

06.02.2013  20:35

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

5 RA Routing Of Pipes (air Lines) (touring) > < 3 RA Removing And Installing_replacing Pipe (air Line) For Air Spring To Air Reservoi|Page 1887