5 Series E39 520i (M54) SAL
Installation:
Feed gaiter (1) downwards and fit on shift lever (2).
Pull rubber gaiter (1) over selector lever and insert in center
console.
Press installation frame of rubber gaiter (1) together a little and
remove rubber gaiter (1) from center console.
Remove soundproofing (1).
Lift off retainer (1).
Remove disk (2).
Remove selector rod (3).
Installation:
Grease shift rod pin.
Grease, refer to BMW Service Operating Fluids.
RA Removing and installing shift lever
BMW AG - TIS
08.02.2013 01:11
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -