bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

15 Electrical Attachments > < 2 RA Replacing Output Flange (A5S 310Z)|Page 1224
Page 1
background image

24 13 706

Replacing bearing on transmission extension
(A5S 310Z)

(output flange removed)

Lift out circlip (1).

Remove ball cage (2).

Heat transmission extension with a hot air blower around the inner
bearing race to approx. 80

°

 C.

Press out outer bearing race (3).

Remove ball cage (4).

Installation:

Heat case once again.

Install ball cage (4).

Press in outer bearing race (3).

RA  Replacing bearing on transmission extension (A5S 310Z)

BMW AG - TIS

12.02.2013  15:49

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

15 Electrical Attachments > < 2 RA Replacing Output Flange (A5S 310Z)|Page 1224