bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 1058 > < 9 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)
Page 2
background image

Block output flange using special tool 23 0 020.

Unfasten collar nut with special tool 23 1 210.

Pull off output flange.

Note:

If ease-of-movement is impaired, remove output flange with
special tool 33 1 150.

Remove radial seal with special tool 00 5 010.

Remove cap (1).

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

14.02.2013  13:53

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

9 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 1058 > < 9 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)