5 Series E39 525i (M54) TOUR
Screw special tool 23 0 490 into one of the two removal holes.
Pull radial sealing ring out of transmission housing with impact
weight.
Caution!
To avoid damaging input shaft, special tool 23 2 460 must
be inserted on the input shaft during removal of the
circlip (3).
Lift out circlip (3) and pull off over special tool 23 2 460.
Remove closing ring (4).
Caution!
To avoid damaging input shaft, special tool 23 2 460 must
be inserted on the input shaft during removal of the
circlip (6).
Lift off circlip (6) and secure to special tool 23 2 460.
Pull special tool 23 2 460 with circlip (6) from the input shaft.
Lift out shim (5).
RA Complete removal and installation of input and output shafts (S5D 200G/ 250G)
BMW AG - TIS
19.02.2013 19:44
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 8 -