5 Series E39 525tds (M51) TOUR
Installation:
Remove release unit and release lever, clean and apply
grease to relevant points.
Installation:
Check lubrication of transmission input shaft for sticky
consistency. If grease is sticky, replace clutch plate.
Check clutch plate for friction rust in taper splines and replace
if necessary.
Mechanically remove old grease and lining abrasion from
taper splines of clutch plate (with a cloth).
Then, using a brush, apply a thin, even coat of grease over
entire area of taper splines, also in taper groove.
RA Removing and installing transmission (S5D 310Z/S5D 320Z)
BMW AG - TIS
20.02.2013 04:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -