5 Series E39 525tds (M51) TOUR
Press switches (1... 2) down out of finisher and pull off cable
connector.
Pull cable connector(1) (ashtray lighting) from bracket and
disconnect.
Unfasten cable connector (2) from bracket.
Unfasten screws and remove finisher (3).
Unfasten screws.
Lift off left and right cover caps and unfasten screws.
RA Removing and installing/replacing shift tower
BMW AG - TIS
20.02.2013 04:57
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -