bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Replacing Pulse Generator (A5S 440Z)|Page 1244 > < 4 RA Replacing Solenoid Valves And_or Pressure Regulators (A5S 440Z)|Page 1242
Page 1
background image

24 34 876

Replacing pulse generator (A5S 440Z)

(Driving or turbine speed)

(Oil sump removed)

Pulse generator driving speed:

Release screw, remove retainer (1) and pulse generator (2) from
transmission housing.

Installation:

Tightening torque,

refer to Technical Data 24 34 4AZ.

Disconnect cable plug (1) from pulse generator (2).

Pulse generator turbine speed:

Release screw, remove retainer (1) and pulse generator (2) from
transmission housing.

Installation:

Secure cable to retainer (3).

Tightening torque,

refer to Technical Data 24 34 4AZ.

RA  Replacing pulse generator (A5S 440Z)

BMW AG - TIS

20.02.2013  14:09

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

5 RA Replacing Pulse Generator (A5S 440Z)|Page 1244 > < 4 RA Replacing Solenoid Valves And_or Pressure Regulators (A5S 440Z)|Page 1242