5 Series E39 535i (M62) SAL
Note:
Pull on connecting piece (1), otherwise only the hose will slip
down from the vent pipe and the connecting piece (1) will
remain in the angle bracket (2).
Withdraw connecting piece (1) with vent pipe from angle
bracket (2) of oil separator.
Pull special tool 11 2 300 back until flywheel is no longer
secured in position.
Lift timing chain and hold under tension.
Note:
Note marks.
Crank engine at central bolt against direction of rotation to 45
°
before TDC position.
Remove special tools 11 2 444 / 443 / 442 / 446.
RA Removing and installing left cylinder head (M62 VANOS from 9/98)
BMW AG - TIS
20.02.2013 11:45
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -