5 Series E39 M5 (S62) SAL
Cylinder bank 5 to 8:
Slacken six accessible bolts two turns.
Crank engine at central bolt in direction of rotation until 1st
cylinder is at TDC firing position. Secure vibration damper in
position with special tool 11 2 300 .
Cylinder bank 1 to 4:
Slacken remaining six bolts two turns.
Cylinder bank 5 to 8:
Slacken remaining six bolts two turns.
RA Removing and installing both cylinder heads (S62)
BMW AG - TIS
21.02.2013 06:37
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 10 -