bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Removing And Installing Both Cylinder Heads (S62)|Page 634 > < 7 RA Removing And Installing Both Cylinder Heads (S62)|Page 632
Page 18
background image

Cylinder bank 1 to 4 (inlet side):

Keep timing chain tensioned and feed on inlet chain wheel (3).

Position inlet chain wheel (3) on centering sleeve. Do not insert
"any" screws into inlet chain wheel (3) yet.

Press tensioning rail against chain and keep tensioned.

Cylinder bank 5 to 8 (inlet side):

Check position of inlet chain wheel (3) to threads.

In event of large deviation (thread not visible):

Detach inlet chain wheel (3) from centering sleeve, realign chain
wheel (3) and refit.

In event of small deviation:

Position special tool  11 7 150  at toothed sleeve on exhaust
side. Align secondary chain drive to bores of inlet chain
wheel (3).

Cylinder bank 5 to 8 (inlet side):

Version up to 9/2001

Caution!

Risk of mixing up parts.

Note:

Plate spring (2) and supporting ring (3) form a set and may only
be fitted together.

Thickness of plate spring (2) = 0.85 mm.

Thickness of supporting ring (3) = 3.55 mm.

Cylinder bank 5 to 8 (inlet side):

Version from 9/2001

Caution!

Risk of mixing up parts.

Note:

Plate spring (4) and supporting ring (5) form a set and may only
be fitted together.

Thickness of plate spring (4) = 1.25 mm.

Thickness of supporting ring (5) = 3.20 mm.

Plate spring (4) and supporting ring (5) may also be fitted in
engine before 9/2001.

RA  Removing and installing both cylinder heads (S62)

BMW AG - TIS

21.02.2013  06:37

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 18 -

7 RA Removing And Installing Both Cylinder Heads (S62)|Page 634 > < 7 RA Removing And Installing Both Cylinder Heads (S62)|Page 632