5 Series E39 M5 (S62) SAL
Release screw connection of battery positive cable at battery
positive connection point (1).
Tightening torque,
refer to Technical Data 12 51 4AZ.
Release screws (2).
Remove cover (3).
Installation:
Insert battery positive lead (1) behind left engine support arm
towards top.
RA Removing and installing or replacing battery positive lead (S62)
BMW AG - TIS
21.02.2013 16:16
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -