bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing Battery Positive Lead (M47T2)|Page 450 > < 2 RA Replacing Solenoid Switch
Page 1
background image

12 42 500

Replacing battery positive lead (M47T2)

Necessary preliminary tasks:

Read fault memory of DDE control unit.

Switch off ignition

Disconnect battery negative lead

Remove oil dipstick guide tube

E60, E61

Release screw.

Installation:

Tightening torque 12 42 1AZ

.

Remove battery positive lead (1) from battery positive terminal.

E87, E90

Unfasten nut.

Installation:

Tightening torque 12 42 1AZ

.

Remove battery positive lead (1) from battery positive terminal.

Slacken nut (1).

Installation:

Tightening torque 12 41 4AZ

.

Disconnect battery positive lead (2) from starter motor.

RA  Replacing battery positive lead (M47T2)

BMW AG - TIS

22.01.2013  20:27

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Replacing Battery Positive Lead (M47T2)|Page 450 > < 2 RA Replacing Solenoid Switch