5 Series E60 520i (M54) SAL
11 00 050
Removing and installing engine (M54)
Special tools required:
•
11 0 020
Follow instructions for disconnecting and connecting battery.
Disconnect negative battery lead.
Observe specified tightening torque and safety precautions in all
work steps.
Work step
Note:
Lift engine hood into assembly position
Secure engine in installation position with special tool
Remove gearbox
After removing transmission,
secure engine against tilting.
Remove intake filter housing
Remove radiator
Remove radiator lines.
Remove expansion tank.
Remove intake air manifold
Release heater cooler line
Unlock engine wiring harness section on control unit and detach.
Wiring harness remains on engine.
Unlock spark plug wiring harness section on control unit and detach.
Wiring harness remains on engine.
Disconnect positive lead at battery connection point
Detach vacuum line from brake booster
Unlock line on tank venting valve and disconnect.
Remove both monitor sensors
Release negative lead on engine support arm.
Remove alternator drive belt
RA Removing and installing engine (M54)
BMW AG - TIS
24.01.2013 15:41
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -